Problem: This multi-family two-story home needed a new HVAC system in the first-floor apartment. Window air conditioning units and an old gas-fired, forced hot water baseboard system was already installed in the home.
Solution: N.E.T.R., Inc. installed a two-unit LG ductless HVAC system with an outdoor condenser unit to supplement the existing baseboard heat and eliminate the need for window ACs.