The Problem: Prime Storage in Dracut, MA had a broken commercial heating unit. The staff used heaters to keep themselves warm through the winter. The existing heating system was also too large for the building's needs.
The Solution: N.E.T.R., Inc evaluated Prime Storage's facility. N.E.T.R., Inc. realized the heating system was oversized and helped the company move to a smaller more efficient unit.