Heating and Air Conditioning Examples in the Boston Area

Marlborough Renovation Includes LG Ductless HVAC System

Written by Mike Cappuccio | Jul 16, 2020 8:11:19 AM

Problem: This multi-family two-story home needed a new HVAC system in the first-floor apartment. Window air conditioning units and an old gas-fired, forced hot water baseboard system was already installed in the home. 

Solution: N.E.T.R., Inc. installed a two-unit LG ductless HVAC system with an outdoor condenser unit to supplement the existing baseboard heat and eliminate the need for window ACs.