Commercial Case Studies

Server Room Upgrades to Mitsubishi Ductless Air Conditioning

Written by Mike Cappuccio | Jun 12, 2019 2:57:09 AM

Problem: Red Oak Sourcing’s server room required a commercial HVAC upgrade to keep the servers cool and protected. They wanted a slim, redundant system to ensure that the servers would stay cool in all weather conditions.

Solution: N.E.T.R., Inc. installed two Mitsubishi ductless air conditioning units in the server room, set to a lead-lag operating schedule that would protect the servers in-case of failure, extend the life of both units, and function in temperatures as low at -20 degrees.